Translate

Thursday, October 4, 2018

Almost done 10.04.18

              They did come yesterday and we do now have an operational shower. We still have one small thing for the contractor to fix and that has to do with the flooring they put in.

            I have one problem that I am trying to fix and that is with the new toilet. Evidently a rubber seal does not totally seal, and about every 10 minutes the toilet does a very small refill, lasting about 2 seconds. I did check it out on you tube and this is a problem with these units. Supposedly I need to call them and they will send a revised version of the gasket.

            I have been pleasantly surprised with the 1.2 gallon flush. I assumed it would not work properly but so far it has, except for the gasket.

           

            Next week they are supposed to start on the kitchen. We will basically be without a kitchen until the project is complete. My little office area is near the kitchen and I am sure they will be going in and out of the door hear in the office. There will be dust and noise so I will probably not want to sit here at the Ford’s ole desk and enter words on the Ford’s very old computer.

 

            A friend is having surgery today so we will be heading to the hospital to sit with the spouse.

            While I have been composing this wonderful article, I have been on hold with the toilet company. They have some so-called music and advertisements. After 26 minutes the music stopped and a recording came on and stated, we are having technical difficulties, we are closed we will open later. 

            I need coffee so I am shutting down, before I get too upset, yes you will miss me!

 

Change your ways, be nice to someone today!

 

Almost always nice; Don Ford

 


Virus-free. www.avg.com

No comments: